What is Defect Management?

Back to articles

Defect Management is a structured process used in construction, infrastructure, and asset delivery projects to identify, record, track, rectify, and close defects throughout the project lifecycle.

Defects can arise at any stage, from early works and construction through to commissioning, handover, and defects liability periods. Effective defect management ensures works are delivered to specificationin compliance with contractual and regulatory requirements, and fit for purpose before final acceptance.

In practical terms, defect management provides project teams with visibility, accountability, and traceability over quality issues onsite, reducing rework, disputes, and delays.


What Is a Defect in Construction?

defect is any work that does not comply with:

  • Approved drawings and specifications
  • Australian Standards and codes
  • Contractual requirements
  • Client or authority expectations

Common construction defects include:

  • Incomplete works
  • Poor workmanship
  • Incorrect installation
  • Damage to completed works
  • Non‑compliant materials or finishes

Defects are typically identified during inspections, walk‑downs, audits, or handover processes.


What Does Defect Management Involve?

A robust defect management process typically includes the following key components:

1. Identification – Defects are identified by:

  • Site supervisors
  • Quality inspectors
  • Engineers
  • Client representatives
  • Independent certifiers

These are often captured during:

  • Pre‑handover inspections
  • Progressive inspections
  • Commissioning checks
  • Final completion walk‑throughs

2. Defect Recording – Each defect is formally logged with clear details such as:

  • Defect description
  • Location (area, level, chainage, asset ID)
  • Trade or subcontractor responsible
  • Reference to drawings or specifications
  • Priority or severity

Clear, consistent recording ensures nothing is missed or duplicated.

3. Defect Classification & Priority – Defects are often categorised to support effective triage, such as:

  • Minor
  • Major
  • Critical

Priority helps teams focus on high‑risk or program‑critical issues first, especially those impacting safety, commissioning, or handover milestones.

4. Corrective Actions – Each defect is assigned:

  • A responsible party
  • Required corrective action
  • Target close‑out date

Corrective works may involve rework, replacement, adjustment, or further inspection.

5. Verification & Close‑Out – Once rectified:

  • Defects are re‑inspected
  • Evidence is captured (photos, sign‑off)
  • The defect is formally closed

This step is critical for handover acceptance and audit readiness.


Why Defect Management Is Critical on Construction Projects

Effective defect management delivers measurable value across safety, quality, cost, and program outcomes.

  •  Reduces Rework and Cost Blowouts: Early identification and tracking of defects prevents minor issues from escalating into major rework, saving time and cost.
  • Improves Quality Outcomes: Consistent defect tracking highlights recurring workmanship or process issues, driving continuous improvement across trades and packages.
  • Supports Program and Handover Milestones: Unresolved defects are a leading cause of delayed handovers. Structured defect management keeps projects moving toward Practical Completion.
  • Strengthens Accountability: Assigning defects to responsible parties ensures clarity, ownership, and timely close‑out.
  • Minimises Disputes: Clear records, photos, timestamps, and audit trails reduce disagreements between contractors, subcontractors, and clients.

Real‑World Examples of Construction Defects

Typical defects captured on construction projects include:

  • Finishes: Scratched glazing, chipped tiles, uneven paint finish
  • Structural: Honeycombing in concrete, incorrect reinforcement cover
  • Services: Missing fire collars, incorrect pipe gradients
  • Civil Works: Poor compaction, surface cracking, drainage issues
  • Electrical: Incorrect labeling, incomplete testing, exposed cabling
  • Commissioning: Equipment not operating to design parameters

Defect Management During the Defects Liability Period

Defect management doesn’t stop at handover. During the Defects Liability Period (DLP):

  • New defects may emerge
  • Latent defects are identified
  • Contractors remain responsible for rectification

A structured defect register ensures obligations are met and formally closed before Final Completion.


Digital Defect Management in Glaass

At Glaass, defect management is streamlined through structured digital workflows designed for real construction environments.

Project teams can:

  • Log defects onsite via mobile devices
  • Capture photos, locations, and references
  • Assign responsibility and due dates
  • Track open vs. closed defects in real time
  • Maintain a complete audit trail
  • Export defect registers for handover and client reporting

By digitising defect management, Glaass removes spreadsheet chaos, reduces admin overhead, and gives teams full visibility from construction through to final close‑out.


Final Thoughts

Defect management is not just about fixing issues, it’s about delivering quality, protecting program certainty, and maintaining professional standards across construction projects.

When managed properly, defects become a controlled, transparent process rather than a last‑minute scramble, supporting safer sites, smoother handovers, and stronger client relationships.